Crusher Projects

  • Currently the 450tph crusher project is under construction and is expected to be commissioned in Q4 2017. The project is expected to boost carats production from conglomerate ore sources

Belarus Equipment

  • The acquisition of 52 pieces of heavy mobile equipment including rigid trucks, FELs, water sprinklers, wheel dozers is expected to increase production. The equipment is currently being assembled on site and commissioning s expected early Q4 2017

Power Project

  • Power supply project will include connecting all portals to the national grid in the near future. The long term vision is to use solar power wherever fit in line with the green energy vision